LW's ZEUS MVD DAQ Page  

mvd

Information for the technical proposal of January 1997:

Information about  the HERA-B HELIX readout system:
Information about the detector Slow-Control:
Analogue Link:
  • requirements  for a possible solution for the ZEUS MVD and a first concept of a  project plan (updated march 1999) for the NIKHEF activities concerning an analogue copper link between detector and veto-wall area.
  • other documentation: H1 (see  also NIM A372(1996)188), CMS
  • Cable arrangement for barrel and wheel combo cables (created nov 1999 and updated later).
  • Spool for  the combo cable during installation of the ladder.
  • Wheel cabling and feedthroughs inside the MVD.
  • Pictures of the ADC crate (front and back side) 
  • Requirements for isolated power.

Information sent to Janet Frasier concerning cabling for the Slow-Control connections and the analogue links (updated Jul 8/Aug 25 1999).

What do we gain from a MVD vertex in the GSLT?
Link to documentation of Ruud Kluit concerning NIKHEF developments.