Information about the HERA-B
HELIX readout system:
- Heidelberg : projects
and ASIC-LABOR
notes
- HELIX chip (
User Manual )
- Irradiation setup
in Utrecht, as used for irradiating an
HELIX 1.1 chip in sept 1997 and the
results of the analysis
Information about the detector
Slow-Control:
Analogue Link:
- requirements
for a possible solution for the ZEUS
MVD and a first concept of a project plan (updated
march 1999) for the NIKHEF activities
concerning an analogue copper link between
detector and veto-wall area.
- other documentation:
H1 (see also NIM A372(1996)188),
CMS
- Cable arrangement
for barrel and wheel combo cables (created
nov 1999 and updated later).
- Spool
for the combo cable during
installation of the ladder.
- Wheel
cabling and feedthroughs inside the
MVD.
- Pictures
of the ADC crate (front and back side)
- Requirements for isolated
power.
Information
sent to Janet Frasier concerning cabling for
the Slow-Control connections and the analogue
links (updated Jul 8/Aug 25 1999).
What do we gain
from a MVD vertex in the GSLT?