  • Cooling test results C-side (Right) replacement detector
  • Cooling test results A-side (Left) replacement detector
  • (february 11, 2011)
    Cooling test of the Left Detector at vertical position is restarted after solving a shortcut problem with one heater.
    (februari 1, 2011)
    Coolingtest on the horizontal Left Detector is running and controlled by Krista en Jeroen.
    (november 19, 2010)
    Preparations are started for the coolingtest on the horizontal Left Detector.
    (november 09, 2010)
    The coolingtests are started on the horizontal Right Detector.
    (august 4, 2010)
    The Right detector is under vacuum 'waiting to be cooltested'.
    (july 30, 2010)
    The right detector Hood is assembled with the Right CO2 evaporator and Module base. The assembly is placed in the cooling lab for preparing the CO2 tests. On each cooling pad heating block a temperature switch (Clickson) is mounted. The Clickson switches the cooling pad off at 110 degrees celcius. There are 5 heaters (56 Ohm each) serial connected.