(april 7, 2010)
3D measurement of the left module support is done by Berend Munneke. Measuring results : Drawing in PDF format, Excel document
(march 9, 2010)
pre-machining of the left module support is started.
(march 4, 2010)
3D measurement of the right module support is done by Berend Munneke. Measuring results : Drawing in PDF format, Excel document
(februari 25, 2010)
final-machining of the right module support is finished.
(februari 17, 2010)
pre-machining of the right module support is finished. Next step is to clean and glue/pin the two parts together.
(februari 11, 2010)
Last steps of the pre-machining of the right module support is started at Nikhef by Michiel Jaspers.
(Januari 21, 2009)
The pre-machined left module support is arrived from the VU
(november 9, 2009)
The pre-machined Right Module Detector Support is delivered at Nikhef. Machining was done at the VU by Mike de Jong
(november 3, 2009)
Different parts are machined and ready for welding together: