(Februari 17, 2010)
Machining of the 2 Hoods is ready. Rob is grinding the O-ring grooves with water and sandpaper.
(Januari 21, 2010)
Machining of one sideflange at both detector hoods are ready
(januari 5, 2010)
Machining of the angled side flanges.
(november 26, 2009)
Machining of the side flanges is started
(september 14, 2009)
The main flange of the second hood and the inside pockets are machined. Note: the rectangular milling device was just big enough to use....
(november 3, 2009)
One detector hood is final machined at the main flange and the back side. The other hood is on the milling machine to start machining the main flange
(september 14, 2009)
Louwers Glass and Ceramic Technologies has delivered the first 12 vacuum feedthrough flanges at Nikhef.
See here for the drawings in pdf format
(august 28, 2009)
Two new hoods are welded at Mogema and delivered at Nikhef.
LINKS TO RELATED SITES