(september 7, 2010)
|
(july 1, 2010)
The Left Evaporator:
The Right Evaporator:
|
(may 4, 2010)
Orbital welding of the Right Evaporator:
Gluing of the PT100's on the coolingpads:
The Left capillary manifold is back from Shell. One capillary is clogged. The flow through the 26 remaining capillaries will be measured.
|
(april 26, 2010)
28 cooling pads are ready to weld to the right evaporator.
The right capillary assembly with bellow is ready for welding together. 3 of 27 capillary are clogged. Decision has been made with the VELO-group at CERN to continue with
this manifold. Cookies will be provided at the Pile-Up positions. A short connection without cookies at slot 22 will be made. And the three clogged capillaries will be closed
|
(april 15-16, 2010)
Pressure test of the right capillary manifold is done at P=170 Bar
|
(april 14, 2010)
Flowtest of the right capillary manifold. 3 of 27 capillary are clogged.
|
(Januari 21, 2010)
3 good cooling pads are made
|