(september 7, 2010)
    The Left Evaporator:
(july 1, 2010)
    The Left Evaporator:
    The Right Evaporator:
(may 4, 2010)
    Orbital welding of the Right Evaporator:
    Gluing of the PT100's on the coolingpads:
    The Left capillary manifold is back from Shell. One capillary is clogged. The flow through the 26 remaining capillaries will be measured.
(april 26, 2010)
    28 cooling pads are ready to weld to the right evaporator.
    The right capillary assembly with bellow is ready for welding together. 3 of 27 capillary are clogged. Decision has been made with the VELO-group at CERN to continue with this manifold. Cookies will be provided at the Pile-Up positions. A short connection without cookies at slot 22 will be made. And the three clogged capillaries will be closed
(april 15-16, 2010)
Pressure test of the right capillary manifold is done at P=170 Bar
(april 14, 2010)
Flowtest of the right capillary manifold. 3 of 27 capillary are clogged.
(Januari 21, 2010)
3 good cooling pads are made
(november 3, 2009)
Different parts are machined and ready for welding or (vacuum) brazing together: