Pile-Up Veto System
Documentation:
- A note (1998) has been produced for the technical proposal ( pile_up part TP ).
- A NIM (2000) article describes the LHCb level 0 and level 1 vertex triggers.
- In April 2000 a workshop was held at NIKHEF to discuss the VELO/Pile-Up Veto systems.
- A description (PDF) for the TDR and for the L0-review on July 4 2002 is available.
- The effect of vertical displacement of the detectors and of different designs has been simulated.
- The article for LEB2002 is put here , plus the powerpoint presentation .
- An investment proposal has been presented to the directorate in september 2002.
- A poster has been made for the 'open day' in october 2002.
- A proposal for the FOM-beleidsruimte has been submitted (jan 2003).
- A presentation during the LHCb workshop (feb 2003) .
- The Trigger TDR of Sept. 2003.
- The talks
of "Overview Pile-Up System": visit Le Gac and Dijkstra, NIKHEF, 10
Sept. 2004.
- Status report
at the L0 workshop May 2005.
- Status presented in Collaboration Week Sept 2005.
- Data Base Configuration presentation september 2005.
- Electronics+L0 session: algorithm presentation;
LHCb week nov 2005.
- T-rec presentation 5 dec 2005.
- Trigger
Monitoring Workshop: Pile-Up System Issues on 10 jan 2006.
- L0-Workshop: L0 Pile-Up on 11 jan 2006.
- Pile-Up
System Hybrid PRR on 17 jan 2006.
Last changed on:
Thu
23 Mar 2006 03:56:42 PM MET;by
Leo Wiggers