PPT Slide
End April: fix foil geometry and thickness
End June: formal approval by LHC of VD design (LEMIC?)
Early May: formal approval by LHCb/VELO
Mid May: formal approval by LHCb of VD design
- manufacture and test self-
- build and test cooling system†
- start producing manufacturing
- build control and monitoring
† = strong impact on LEMIC
Timeline and Milestones (highlights)
- manufacture prototype Al box,
then leak & pressure tests†
- manufacture a WF suppressor
model, perform RF studies†
- build and test Ti evaporator
- complete testing (vacuum,