PPT Slide
- provide FEE cabling from feedthroughs to some available
connectors coming from the hybrids
- cabling for cooling system and control (see definition below)
- cabling for temperature control of stations
- we assume some group will take care of testing the complete
- provide reference points for station alignment with respect to
- provide reference points for external alignment of boxes
- guarantee internal alignment and reproducibility of boxes
- provide possibility to move the center frame via a remote-
- interactive alignment with respect to beams using tracking,
beam feedback control and XY-table
- internal alignment and reproducibility of detector stations
- we assume some group will take care of the complete LHCb
NIKHEF VD responsibilities:
how do we currently see it ?
“YES, ours” “NO, not ours”
(not included here: Pile-up and FEE)