err num frac description --------------------------------------------------------------- 110 39 0.10 Fails visual inspection 120 135 0.34 Tube length out of range 130 7 0.02 Used for destructive test 140 44 0.11 Dropped or damaged during handling 150 4 0.01 Tube missing for unknown reason 200 90 0.23 Damaged during wiring 205 8 0.02 Wire broken in tensioning 310 177 0.44 Fails wire tension test after wiring 320 21 0.05 Fails wire tension test before assembly 330 11 0.03 Fails wire location test 340 418 1.05 Fails gas leak test 350 36 0.09 Fails leak current test 352 1 0.00 Fails dark current: wire found broken at dark current station Tubes: 39943, Rejected: 991 (2.48 %) - Last produced chamber: BOL100 (SP 2160 A3)