(november 1, 2006)
A accumulator is added to the coolingsetup by Peter Thobe.
(may 31, 2006)
Flow test with a reinforced heat exchanger.
(may 12, 2006)
High pressure test with a reinforced heat exchanger from SWEP
*** Pressure Test Results ***

(november 11, 2005)
New CO2 Pump

(july 28, 2005)

(march, 2000)
LINKS TO RELATED SITES
  • Production
  • 3D DESIGN/ Drawings in PDF Format
  • Si Detector