(august 17, 2007)
The final Carbonfibre connection bar between the PileUP's
(august 7-9, 2007)
Two PileUP modules on the A-detector (LEFT) are reinforced by two CF bars. The connection bar between the PileUP's
(february 12-14, 2007)
The two PILEUP modules are installed on the RIGHT DETECTOR at the assemblylab at CERN
(february 7, 2007)
The second PILE-UP module is assembled, glued and adjusted.
(february 1, 2007)
The first PILE-UP detector is glued to the module base at the 3D measuring room at NIKHEF
(january 26, 2007)
Michiel Jaspers glued a carbinfibre rib is to stiffen the paddle structure
(january 26, 2007)
The electrical testsetup at NIKHEF
(january 25, 2007)
The assembly table for glueing the hybrid to the module base is ready
(december, 2006)
A pile-up hybrid is bonded with a silicon detector
LINKS TO RELATED SITES
  • 3D DESIGN Detector
  • Production RIGHT Detector
  • Production LEFT Detector