(august 17, 2007)
The final Carbonfibre connection bar between the PileUP's
|
(august 7-9, 2007)
Two PileUP modules on the A-detector (LEFT) are reinforced by two CF bars. The connection bar between the PileUP's
|
(february 12-14, 2007)
The two PILEUP modules are installed on the RIGHT DETECTOR at the assemblylab at CERN
|
(february 7, 2007)
The second PILE-UP module is assembled, glued and adjusted.
|
(february 1, 2007)
The first PILE-UP detector is glued to the module base at the 3D measuring room
at NIKHEF
|
(january 26, 2007)
Michiel Jaspers glued a carbinfibre rib is to stiffen the paddle structure
|
(january 26, 2007)
The electrical testsetup at NIKHEF
|
(january 25, 2007)
The assembly table for glueing the hybrid to the module base is ready
|
(december, 2006)
A pile-up hybrid is bonded with a silicon detector
|