(oktober 25 , 2006)
The LEFT evaporator is ready and Bart junior (Teun) is inspecting our work.
(oktober 18 , 2006)
Test of all electronic connection with a haptas system.
(oktober 11 , 2006)
The PT100's are routed and connected (soldered) to the two electronic boards.
(september 22 , 2006)
The coolingblocks are orbital welded at the Shell Amsterdam.
(june 30, 2006)
The first test cooling block is succesfully made. Production of the first batch of 12 cooling blocks is started.
(may 12, 2006)
Erno is routing the capillary into the evaporator.