(march 10, 2010)
4 gaskets PDF are made for the connection to the VELO replacement detector

(may 11, 2006)
The moveable C02 cooling system is isolated. Tests are done at NIKHEF but will be finisched at CERN connected to the the right detector

(april 28, 2006)
The moveable C02 cooling system (so called 'Blowsystem') is ready and tests are started on the right detector

(march 6, 2006)

(februari 16, 2006)
A moveable C02 cooling system for testings modules at CERN. It's using a bottle. Inlet = 55 Bar / Outlet = 11 Bar > Temp = -27 Degrees Celcius.