(april 6, 2004) Assemble of all mechanical parts is finisched. |
(febr 19, 2004) Mounting of the translation tables on the bottom-part is started. |
(february 13, 2004) Final machining of the frame 2 is ready! |
(januari 21, 2004) Frame is measured with the 3D Wenzel measuring machine |
(jan 13, 2004) Final maching is undergoing. |
(december 4, 2003) The two frames are welded and delivered at NIKHEF. |
(september 2, 2003) Machining of the Stainles steel translation tables at NIKHEF. |