Table 1: Action list.
Nr. Item/Action Description Responsible Brought in Ready Finished Status/remarks
1 Delphi Kapton cables experience call Hans Dijkstra Massi 2/2/00 16/02/00 - -
2 Cooling system; 19 stations realisation of test set-up Onno/Martin 28/10/99 20/01/00 - -
3 Cooling system; 19 stations set up temperature measurement Jaap 28/10/99 28/12/99 - -
4 Cooling system; 19 stations  set up control loops Jaap 28/10/99 ? - -
5 Liverpool meeting  Silicon/hybrid/foil design Martin/Jo 28/10/99 28/11/99 - -
6 Cooling test report Onno 11/11/99 16/02/00 - -
7 Wakefield note III finish and publish Massi/Niels 11/11/99 29/11/99 - -
8 Radio activation report Tjeerd/Piet L? 11/11/99 2/12/99 - -
9 FEA note write and publish Marco/Massi/Niels 11/11/99 9/12/99 - -
10 Disrupting leak investigate Onno 9/12/99 12/01/00 - -
11 FEA center frame report Marco 03/02/00 02/03/00 - -
12 Interlock system start design Jaap/Luc 02/03/00 ?/?/00 - -
13 Signal wires contact Martin vB Niels 02/03/00 16/03/00 - -
14 CO2 cooling system write up Herman 02/03/00 30/03/00 - -
15 Continue outgassing tests Silicon supports ?? 16/03/00 30/03/00 - -
16 Geometry Si-detectors ask Liverpool Massi 16/03/00 30/03/00 - -
17 RF leakage note Finish and publish Frans/Niels 30/03/00 30/04/00 - -
18 Planning NIKHEF LHCb work Publish on web Massi et al. 30/03/00 16/04/00 - see web
19 Vacuum encapsulation measurements Leak tightness and differential pressure Chiel/Jan? 30/03/00 ?? -
Table 2: Taken actions.
Nr. Action Description Responsible Decided Remarks
1 Minutes write and distribute Niels 14/10/99 see web
2 Vertex MT meetings chairman  Massi 14/10/99 -
3 Heat dissipation studies LHCb note 99-040 VELO - 15/01/00 see web
4 Wakefield I LHCb note 99-041 VELO - 15/01/00 see web
5 Mechanics  LHCb note 99-042 VELO - 15/01/00 see web
6 Parameter list set up as living document Niels/Massi 25/11/99 see web
7 Dynamical pressure presentation Massi 23/12/99 see web
8 Wires responsibility ask Thomas Ruf Massi 13/12/99 see web
9 PC for temp. control available  - 15/01/00 -
10 RF leakage estimation presentation Frans 13/01/00 see web
11 ABS tank available Martin 03/02/00 -
12 NTC sensors and control card available Jaap 17/02/00 -
13 Outgassing flat cable/connectors report/presentation Onno 03/02/00 see web1,2,3
14 RF leakage estimation write up Frans 02/03/00 see web?
15 Multiple scattering LHCb note 2000-019 VELO - 15/03/00 see web
16 Vacuum note LHCb note 99-045 VELO - 15/03/00 see web
17 Wakefield note II LHCb note 99-043 VELO - 04/0300 see web 