(april 7, 2010)
3D measurement of the left module support is done by Berend Munneke.
Measuring results : Drawing in PDF format, Excel document
|
(march 9, 2010)
pre-machining of the left module support is started.
|
(march 4, 2010)
3D measurement of the right module support is done by Berend Munneke.
Measuring results : Drawing in PDF format, Excel document
|
(februari 25, 2010)
final-machining of the right module support is finished.
|
(februari 17, 2010)
pre-machining of the right module support is finished. Next step is to clean and glue/pin the two parts together.
|
(februari 11, 2010)
Last steps of the pre-machining of the right module support is started at Nikhef by Michiel Jaspers.
|
(Januari 21, 2009)
The pre-machined left module support is arrived from the VU
|
(november 9, 2009)
The pre-machined Right Module Detector Support is delivered at Nikhef. Machining was done at the VU by Mike de Jong
|
(november 3, 2009)
Different parts are machined and ready for welding together:
|