last update 09-07-2008 LJ
|
Department of Electronics Technology Project:39300 |
Mechanical Engineering
|
|||||||
|
Procedures vacuum control (flowcharts)
Main procedure overview
Procedure-tot
A process to start-up from an undefined to a defined situation Prepare Procedure to evacuate the Velo with Bake-out interruption Evacuate Procedure to vent the Velo from vacuum to atmospheric Venting |
||||||||
|
|
|
Production vacuum
vessel: http://www.nikhef.nl/pub/departments/mt/projects/lhcb-vertex/production/Vessel/ Status assembly work: |
||||||
|
Drawings |
Procedure.pdf (14 pages) | |||||||
| Software | ||||||||
| PLC programming |
SIMATIC manager Step7 version V5.4 SIMATIC WinCC flexible 5.4 SP2 |
|||||||
| Hardware | ||||||||
| Cabinets |
19inch-cabinets.pdf
Cabinet-2-constructions.pdf (2 pages) vacuum cabinet-1(plc) weight +/-155kg vacuum cabinet-2 weight +/-290kg (incl. UPS) (empty cabinet 126kg) Dimensions H=2200mm incl console 2340mm D=800mm and W=512mm |
Welding of the
'Detector Support' at the Free University of Amsterdam http://www.nikhef.nl/pub/departments/mt/projects/lhcb-vertex/production/Detector_support/ Lifting and installation device: http://www.nikhef.nl/pub/departments/mt/projects/lhcb-vertex/production/Lifting_and_Install_devices/ The 'Detector Support' lifting device is tested at RUSCH in the Netherlands: http://www.nikhef.nl/pub/departments/mt/projects/lhcb-vertex/test/LiftingDevices/ |
||||||
| PLC |
PLC_PreFab-cable.pdf (4 pages) |
PLCconnections.pdf | ||||||
|
Roughing Pumps Wiring connections Cable setup |
Roughing Pump control
|
Primarypump_cables.pdf
|
![]() |
Publication of the VELO in NEVAC (a
Dutch vacuum magazine). http://www.nikhef.nl/pub/departments/mt/projects/lhcb-vertex/PUB/NEVAC |
||||
|
Turbo pumps Wiring connections Cable setup |
Turbo pump control TPG350
|
|
![]() |
|||||
|
Ion pumps Wiring connections Cable setup |
Ion pump control Midivac
|
IonPump_cables.pdf |
![]() |
|||||
|
Gauges Wiring connections Cable setup |
Vacuum gauge readout TPG300
|
Gauge-cable-Connections.pdf
|
![]() |
|||||
|
Valves Wiring connections Cable setup |
From valves to patch panel
|
![]() |
||||||
|
Overpressure Switches Wiring connections Cable setup |
Fro OS to patch panel
|
|
![]() |
|||||
|
Bake-out heaters pump set PS300 |
From PS300 to patch panel
|
PS300-Heating.pdf | ||||||
|
Vessel Bake out Temperature readout |
From Velo bake-out control to patch panel
|
Vessel_Temp_Readout.pdf | ||||||
| UPS |
UPS (rear)
UPS connect to Diesel-generator-system Max = 3200W Min = 2540W |
UPS_battery_sense.pdf | ||||||
|
Power 230V total 2groups |
Standard electrical distribution (cut when power fail) (AUG) Max = 2880W Min = 2530W |
Each group 1 phase (16A max) 3680W |
||||||
| All vacuum cable connections (cable book) |
Cables at Cern (xls)
Cable in detail (xls) |
|||||||
|
Control Panel and Ethernet / Internet |
Operator control and Monitoring device Multi Panel (MP370) This part is still under construction
|
|||||||
| All vacuum components | Vac_Contr_parts.xls | |||||||
|
Do you have questions, comments or its content, contact me by
e-mail please.
Nikhef Office H148, phone: (31) 20 592 2197 |
||||||||
Cern
https://edh.cern.ch/
Nikhef
http://www.bookingsystem.com
private
https://webmail.internl.net/src/login.php