The slow controls for the ATLAS detector

project name
last update
Status
remarks     
The B&T interface for the Atlas MDT
24 0ct. 2003
 
Saclay B0 measurement
4-26-2001
 
De kalibratie van de 3D B-veld sensor voor ATLAS
6 febr. 2003
dutch 
The Zero Iron Power Supply
 
Finished
 
The MDT Wire Position Meter
4-3-2000
Finished
 
DAC for the ELMB 
6-nov-2002
Finished
 


Back to the ATLAS electronics index page