LMT Tests at NIKHEF
Most LMT's have been tested and assembled into trays by Freiburg.
But some -- in particular, any replacement tapes for failed LMT's found during assembly --
will come directly to NIKHEF, and will need testing before use.
-
Visual inspection: Check integrity. Check SAMTEC connector soldering on PPF0.
-
Length: Compare to the original faulty tape. If different, check using the Freiburg spread-sheet
that the new one will still be in spec.
-
HV: Check for a resistance of at least 10 GOhm, with the HV line at 500 V and all other
lines grounded.
-
Snake test: check for shorts and continuity with the snake test. Nominal R = 10.5 kOhm.
-
Add kapton tape to PPF0 to protect HV line and resistor from shorting to the guide plate.
-
Send results to Freiburg for addition to their spread-sheet.
Nigel Hessey, 6 March 2005