Tests at NIKHEF

Modules are tested at production, at reception, after putting on a disc, and after putting discs in the cylinder. We also test services at various stages. The table below shows rooms, people, and phone numbers.

Testing of modules made at NIKHEF is now complete. (2004).
Reception testing of modules sent to NIKHEF is now complete. (Oct 2005).
Tests
Location
Local Phone
Contact person
Services to disc
Muon clean room (H070)
5042
Patrick Werneke
Final acceptance of services on disc
Endcap assembly room (H025)
5198
Auke-Pieter Colijn
NIKHEF module tests
Complete
-
-
Module reception tests
Module-to-disc room (H023)
5198
Paul de Jong
Modules on disc
Endcap assembly room (H025)
5198
Paul de Jong, Auke-Pieter Colijn
Disc in cylinder
Endcap assembly room (H025)
5198
Paul de Jong, Auke-Pieter Colijn
On-cylinder services
Cylinder services room (H026)

Fred Hartjes

DAQ and cooling plant hut 5178



Modules-on-disc test results


Module-problems summary database



Documentation

There is an old estimate of the cooling needed in the DAQ hut available here, which looks as though the present hut cooling is adequate.
Instructions for ESD and cleanroom clothing is available here.

The modules are very valuable and must be protected against accidental damage. The protection systems are described here

Overall Module-to-disc Instructions
DCS instructions
Cooling plant instructions
Power Supply instructions
Services-on-disc final testing
Modules-on-disk test sequence
SCT RODDAQ instructions
Setting up a disc in disc test box for DAQ
Testing a disc in cylinder box
Closing the cylinder test box.
Adding module trim and mask configuration data to xml files.
Cylinder Module Mappings.
LMT reception tests.

Nigel Hessey