National Institute for Subatomic Physics

Pile-Up Veto System

Projectleader: Leo Wiggers

Documentation:

  1. A note (1998) has been produced for the technical proposal  ( pile_up part TP ).
  2. A NIM (2000) article  describes the LHCb level 0 and level 1 vertex triggers.
  3. In April  2000 a workshop was held at NIKHEF to discuss the VELO/Pile-Up Veto systems.
  4. A description (PDF) for the TDR and for the L0-review on July 4 2002 is available. 
  5. The effect of vertical displacement of the detectors and of different designs has been simulated.
  6. The article for LEB2002 is put here , plus the powerpoint presentation .
  7. An investment proposal has been presented to the directorate in september 2002.  
  8. A poster has been made for the 'open day' in october 2002.
  9. A proposal for the FOM-beleidsruimte has been submitted (jan 2003).  
  10. A presentation during the LHCb workshop (feb 2003)  .
  11. The Trigger TDR of Sept. 2003.
  12. The talks of "Overview Pile-Up System": visit Le Gac and Dijkstra, NIKHEF, 10 Sept. 2004. 
  13. Status report at the L0 workshop May 2005.
  14. Status presented in Collaboration Week Sept 2005.
  15. Data Base Configuration  presentation september 2005.
  16. Electronics+L0 session: algorithm  presentation; LHCb week nov 2005.
  17. Specification L0DU input and output.
  18. T-rec presentation 5 dec 2005.
  19. Trigger Monitoring Workshop: Pile-Up System Issues on  10 jan 2006.
  20. L0-Workshop: L0 Pile-Up on 11 jan 2006.
  21. Pile-Up System Hybrid PRR on 17 jan 2006.
  22. L0-Workshop: L0 PileUp System 15 feb 2007.
  23. L0-Workshop: L0 PileUp System 17 oct 2007.
  24. L0-PU Readiness Review 8 may 2008.
  25. L0-Workshop: L0 PileUp System 23 oct 2008.
  26. L0-Workshop: L0 PileUP Error detection and reporting 9 jun 2009.